Belgrade metro project moves to next stage
29 August 2021Egis has been awarded the next stage of the development of new metro lines to serve Belgrade in Serbia.
Egis has previously completed earlier studies for its client, BMV, including the preliminary design for Line 1. It has now been commissioned to undertake the next stage of design development comprising the preliminary designs for Line 1 Phase 2 and Line 2.
It will provide preliminary designs, an environmental and social impact assessment, technical specifications and a feasibility report over a 25-month period.
Both Lines 1 and 2 are predominantly underground. Line 1 will run north to south from Železnik to Mirijevo, with a total length of 21.3km and 23 stations. Line 2 will run east to west from Bezanija to Mirijevo, with a total length of 19.2km and 23 stations.
Related
-
Scatec secures financing for 60 MW of solar in Botswana
21 December 2024
-
Enel to retrofit battery storage at century-old pumped hydro storage plant
20 December 2024
-
Malaysia forms JV with China Communications to run East Coast line
20 December 2024
-
Polish capacity market auction for 2029 catalyzes gigawatts of battery storage
20 December 2024
-
Envision Energy signs its largest single wind contract in Philippines
20 December 2024
-
ABB to acquire Gamesa Electric’s Spanish power electronics division
20 December 2024