Fluor team wins $640m Dallas highway project
4 August 2021
A Fluor joint venture has won the contract for the next phase of the Interstate 35E expansion in Dallas in the US state of Texas.
The joint venture with Austin Bridge & Road was selected by the Texas Department of Transportation (TxDOT) to design, construct and maintain Phase 2 of the I-35 project. The contract has a value of approximately US$640m (£460m).
“This is a great example of Fluor’s continued strategic focus on infrastructure projects in Texas,” said Terry Towle, group president of Fluor’s Urban Solutions business. “We’ve continuously worked with TxDOT for the past 20 years. Fluor is pleased to have the opportunity to continue building on its long history in Texas.”
The 10.1km design-build project includes full reconstruction and expansion of six existing general purpose lanes to eight general purpose lanes, with new auxiliary lanes at entrance and exit ramps, and the reconstruction of frontage roads along the corridor. The project also reconstructs the two existing tolled managed lanes.
Construction is scheduled to begin in late 2021 with substantial completion anticipated in late 2025.
Related
-
Tender issued for Libyan gas project
19 September 2026
-
Zambia inks PPA for 500 MW solar project
19 September 2026
-
reNIKOLA and Syarikat SESCO Sign 363 MWp Solar PPA in Sarawak
18 September 2026
-
Metito wins O&M contract for Dubai South Sewage project
18 September 2026
-
Aldar and Mubadala acquire Masdar City Square
18 September 2026
-
China’s Sinoma wins Ras Al-Khaimah cement plant contract
18 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2