World bank loans Argentina $347m for Buenos Aires railway upgrade
8 May 2021
                        The World Bank has approved a $347m loan to improve the service and infrastructure of Argentina’s Mitre railway line, which serves 7 million people a year in Buenos Aires Province.
Funding will be spent on:
Construction of the Law Faculty station, which will link to the city’s subway
An elevated station in Bancalari that will act as a hub for multiple feeder lines
The remodelling of 16 stations
The expansion and renovation of Retiro station’s railyard
Renewal of the Tigre feeder line
Electrical improvements.
In the wake of Covid-19, funding will be spent on ventilation and tracking carriage occupancy in real time to encourage social distancing.
Alexis Guerrera, Argentina’s transport minister, said: “This is a very important step forward in the path set by President Alberto Fernández, and already started by Mario Meoni, to modernise our passenger railroad transportation.
“The train is one of the most used means of transportation by Argentine men and women, and thanks to this financing we are going to be able to initiate an historic transformation in the Mitre line that will improve the quality of life of millions of people.”
Jordan Schwartz, the World Bank’s director for Argentina, Paraguay and Uruguay, said: “Today more than ever it is necessary to modernise transport systems so that they are safe, efficient and sustainable for all people who travel to work, study or use the train as a means of transportation.”
Related
- 
                    
                        
                        Bids in for 10km breakwater at India’s latest megaport
4 November 2025
 - 
                    
                        
                        Blackstone firm launches $3bn Saudi data centre venture
4 November 2025
 - 
                    
                        
                        Yellow Door Energy signs PPA for Bahrain solar project
4 November 2025
 - 
                    
                        
                        Aljomaih consortium achieves $2.3bln financial close for IWTP project
3 November 2025
 - 
                    
                        
                        Meralco increases stake in Philippine’s largest solar developer
2 November 2025
 - 
                    
                        
                        L&T named as preferred EPC contractor for 300 MW wind project in Uzbekistan
1 November 2025
 
                    
                    
                    
                    
                    
 

京公网安备
    11010802030424号 
京ICP备19046776号-2