Ireland approves 1,367 MW of solar in sixth renewables auction

27 November 2026
Ireland approves 1,367 MW of solar in sixth renewables auction

Ireland’s grid operator EirGrid has published the provisional results of the sixth onshore Renewable Electricity Support Scheme auction (RESS 6). As in previous years, solar dominated this auction, with 1,367.24 MW of PV provisionally approved across 22 projects.

In comparison, just 188.05 MW of onshore wind was provisionally successful across six projects.

The weighted average offer price for PV was €0.10242 ($0.1121)/kWh.

On paper, RESS 6 results show an increase compared with the 860 MW provisionally approved as part of RESS 5 in September 2025.

A total deemed energy quantity of 1,894.04 GWh was provisionally successful in RESS 6, with solar’s portion of this coming in at 1,317.48 GWh. Just under 1 TWh – 977.67 GWh – of solar was provisionally unsuccessful.

RESS 6 is the first RESS auction to implement the non-price criteria requirements set out under Article 26 of the European Union’s Net-Zero Industry Act (NZIA). It introduced new pre-qualification requirements and non-price award criteria into the RESS 6 auction process, which drew mixed reactions from Irish market observers.

Ireland now has more than 3 GW of solar and is expected to surpass 3.3 GW of installed capacity by the end of the year, still short of its 2030 target of 8 GW of solar, as Power pointed out.

to
TOP