Green Volt signs deal with Siemens Gamesa for offshore wind turbines
26 November 2026
Green Volt, a floating offshore wind project led by Flotation Energy and Vårgrønn, has signed an agreement with Siemens Gamesa to reserve 28 offshore wind turbine slots and specialist engineering services.
The deal is described as a world first for commercial-scale floating wind and secures both turbine manufacturing capacity and specialist engineering resources. The Green Volt wind farm is located about 50 miles off the coast of Peterhead, Scotland, and is planned to have up to 560MW of generating capacity.
It has already obtained offshore consent from the Scottish Government and was awarded a 400MW Contract for Difference by the UK Government in 2024.
In a separate development, Green Volt has signed a letter of intent with the Port of Aberdeen for future anchor and mooring marshalling operations. This arrangement is expected to support a £15m ($19.6m) investment in port infrastructure, facilities and associated supply chain activities.
The project aims to deliver renewable power to the UK grid and help decarbonise offshore oil and gas operations, supporting the UK's energy security and emissions reduction goals.
Related
-
Tongwei to supply 846 MW of modules to Rezolv Energy for Dama Solar
26 November 2026
-
Peñoles and Atlas sign a 20-year contract for 269 MWp of solar capacity
26 November 2026
-
Photosol develops a 10 MWp agrivoltaic project at a pig farm
26 November 2026
-
SmartestEnergy signs 20-year PPAs for 2.8GW Norfolk wind farms
26 November 2026
-
Suzlon commits Rs 200 crore to a blade factory in Thoothukudi
26 November 2026
-
Encavis signs two-year PPA with e.optimum for 38 GWh of wind power
26 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2