THE ENTIRE NORTHERN AEGEAN HIGHWAY IS OPENED
30 October 2026
Northern Aegean Highway, whose 91 km part was taken into service last year, is completed by reaching to 96 km length as 5 km additional area in Menemen-Aliağa-Çandarlı route is opened.Last stage opening of the project, which provides safe transportation to tourism and industrial regions, was carried out by the attendance of the President Recep Tayyip Erdoğan. The entire Northern Aegean Highway (Menemen-Aliağa-Çandarlı Highway), whose foundation was laid on April 5th, 2017 in accordance with 2023 targets of Turkey, significantly reducing transportation distances to the most important marine trade, industrial and tourism centers of the region was opened with the ceremony arranged on February 22nd Saturday by the attendance of the President Recep Tayyip Erdoğan. Minister of Transportation and Infrastructure Mehmet Cahit Turhan, General Manager of Highways Abdulkadir Uraloğlu, Kalyon Holding Board Chairman Cemal Kalyoncu and IC Holding Board Chairman İbrahim Çeçen also attended the ceremony. Northern Aegean Highway, which came to life by co-investments of IC Holding and Kalyon Holding providing added value to Turkey with the investments they made in all sectors that are engaged in, is located totally on 96 km length as 56km is highway and 40km is connection roads. There totally 19 crossroads, 1 tunnel, 7 toll collection areas, 3 highway service facilities, 8 viaducts and 38 bridges within the scope of the project consisting of totally 6 lanes as 3 lanes are for going and 3 lanes are for coming. 192 cameras, 26 variable message signs, 34 variable traffic signs, 21 traffic counting sensors, Scada tunnels/highway safety data are monitored from a single center and fast reactions are given against emergency cases all along highway route by means of the technology in Northern Aegean Highway equipped with Smart Transportation Systems on the purpose of providing safety of traffic and highway users. 7/24 uninterrupted services are provided by 32 exit and 224 entry facilities in 7 stations equipped with the latest modern technology in Northern Aegean Highway.
Related
-
RailWorks Completes Critical Outage for VTA Light Rail Expansion Project
30 October 2026
-
The new Altza–Galtzaraborda section of the Topo comes into service
30 October 2026
-
Orion Group Holdings Announces New Contract Awards of $250 Million
30 October 2026
-
COMSA contributes to the electrification and modernisation of the Algarve Line in Portugal
30 October 2026
-
Construction begins on Chereh floating solar PV project in Malaysia
30 October 2026
-
Award of Construction Contract for New Educational Facilities for The Hong Kong Polytechnic University
30 October 2026


京公网安备
11010802030424号
京ICP备19046776号-2