ACCIONA Energía begins commercial operation of two wind farms in Croatia
20 October 2026
ACCIONA Energía has completed the commissioning and start of commercial operations of its Opor (27MW) and Boraja II (45MW) wind farms in Croatia. Both wind farms have begun supplying electricity to the national grid through Hrvatski Operator Tržišta Energije (HROTE), the Croatian energy market operator.
The Opor wind farm is located in the Split-Dalmatia region and features six turbines, while Boraja II is in Šibenik-Knin and comprises ten. Both use 4.5MW Nordex turbines mounted on 105-meter steel towers.
Both projects are linked to 12-year contracts for difference, awarded through a public auction under a program launched by the Croatian Government and HROTE and approved by the European Commission to accelerate the deployment of renewable energy. This mechanism guarantees a reference price for the electricity generated, providing revenue stability for the projects and reducing their exposure to wholesale market price volatility.
The Opor and Boraja II wind farms created up to 400 direct jobs during peak construction activity. The projects will generate around 203GWh of clean electricity annually and prevent the emission of approximately 135,000 tonnes of CO₂ each year.
With the commissioning of Opor and Boraja II, ACCIONA Energía strengthens its presence in Croatia, where it owns and operates the Jelinak wind farm (30MW), also located in Split-Dalmatia, since 2013. The company now has 102MW of installed wind power capacity in the country and is also building the Promina solar plant (189MWp) in the Šibenik-Knin region.
Related
-
Zimbabwe's 2027 Budget Lists NRZ Commercialisation and Bulawayo–Victoria Falls Line Rehabilitation among Rail Priorities
22 November 2026
-
Croatia’s HEP launches EUR 480 million tender for Kosinj hydropower system
21 November 2026
-
Lion Thorn solar park, South Africa
21 November 2026
-
Necsa welcomes government commitment to nuclear sector
20 November 2026
-
Initial results of 3D seismic survey in Amsterdam, Netherlands published
20 November 2026
-
Kazakhstan reviews 2 GW wind projects with TotalEnergies, Masdar
20 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2