Riyadh tenders King Salman Stadium works
27 October 2026
Saudi Arabia’s Sports Ministry has tendered a contract covering early works at King Salman International Stadium in Riyadh. The scope includes enabling works, site preparation and initial construction activities.
The tender was issued on 11 October, with a submission deadline of 19 November.The stadium will cover about 660,000 square metres (sq m) and seat 92,000. Facilities will include a 150-seat royal suite, 120 hospitality suites, 300 VIP seats and 2,200 dignitary seats.
The wider development will include sports facilities covering more than 360,000 sq m, including two training fields and fan zones; a closed sports hall; an Olympic-sized swimming pool; an athletics track; and outdoor courts for volleyball, basketball and padel.
The stadium is set to host the final of the 2034 Fifa World Cup and will serve as the Saudi national football team’s main base. US-based architectural firm Populous is the lead architect for the stadium.
Construction of the stadium is expected to be completed by 2029. The stadium will be located next to King Abdulaziz Park. Firms submitted prequalification statements for the main design-and-build contract in February.
Saudi stadium plans
In August 2024, MEED reported that Saudi Arabia planned to build 11 new stadiums and refurbish four facilities for the 2034 Fifa World Cup.
Eight stadiums will be located in Riyadh, four in Jeddah and one each in Al-Khobar, Abha and Neom.
A further 10 cities will host training bases: Al-Baha, Jazan, Taif, Medina, Alula, Umluj, Tabuk, Hail, Al-Ahsa and Buraidah.
There are expected to be 134 training sites in the kingdom, including 61 existing facilities and 73 new venues.
Saudi Arabia was officially selected to host the 2034 Fifa World Cup during an online convention of Fifa member associations at the Fifa Congress on 11 December 2024.
Related
-
Generation Steel signs renewable PPA with BHP for proposed Collie steel mill
27 October 2026
-
Deal signed for 1,620-home Baghdad residential scheme
26 October 2026
-
Axpo and Fortia Sign Second 10-Year Wind PPA for Votorantim Cimentos
26 October 2026
-
Audi to build first $4bn US manufacturing plant in Georgia
26 October 2026
-
ENNA Solar acquires Romanian Medgidia project: 166 MWp of solar and 612 MWh
26 October 2026
-
QatarEnergy and TotalEnergies to develop Lebanon solar plant
23 October 2026


京公网安备
11010802030424号
京ICP备19046776号-2