Netherlands plans CfDs to replace large-scale solar subsidy in 2027
3 November 2025
The Netherlands will replace its subsidy program for large-scale renewable projects with a two-way CfD scheme starting in 2027, according to the Ministry of Climate Policy and Green Growth. The proposed shift aims to align national policy with EU electricity market reforms.
The existing SDE++ program provides multi-year operating subsidies for large-scale solar, wind, and hydropower projects. According to the ministry, the European Commission considers the current subsidy structure overly generous and believes it distorts the market.
Under the new framework, projects larger than 200 kW will receive a fixed price for electricity generation through a two-way CfD. When market prices fall below the strike price, the government will compensate developers for the difference; when prices exceed it, developers will return the surplus.
The ministry said existing SDE++ subsidies will remain unchanged. A public consultation on the CfD proposal is open until Nov. 14.
Several European nations, including Romania and the United Kingdom, already use two-way CfDs for large-scale renewables.
In June, the Ministry of Economic Affairs announced results of the 2024 SDE++ round, awarding 1.79 GW of solar capacity – 1,237 MW of ground-mounted projects, 448 MW of industrial rooftop systems, and 107 MW of floating installations. Applications for the 2026 round remain open until Nov. 6, with an €8 billion ($9.3 billion) budget.
In September, the Ministry of Climate and Green Growth and the Ministry of Housing and Spatial Planning proposed amendments to the Dutch Environmental Decree to accelerate permitting for transmission and distribution projects above 21 kV.
Related
-
Tender – Geophysical investigations for geothermal exploration in Brabant Massif, Belgium
16 September 2026
-
Renewables in Europe: TotalEnergies Acquires Shell's Renewables Business and Sells a 50% Stake in a Portfolio of Developed Assets to KKR
15 September 2026
-
Germany: Nordex secures 34 MW order for Rauschenberg wind farm
15 September 2026
-
Eurasian Development Bank: Central Asia Economy Grows by 6%
11 September 2026
-
Google pledges €13bn investment in digital infrastructure in Finland
10 September 2026
-
Mistral raises €3bn in Series D led by Samsung Electronics
9 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2