CJIC won the Bid of Rural Development Programme in Lao PDR Phase IV, Phongsaly, RDP IV- PSY 01 - Lot2 - RR1328 - Khoua District (14.6km)
10 October 2025
Recently, the Ministry of Public Works and Transport (MPWT) of Phongsaly Province of Lao People’s Democratic Republic officially award the above mentioned project to the company CJIC.
The project is located in Phongsaly Province , The main works include the rehabilitation to gravel of 8.24km, upgrading to DBST of 3.92km, upgrading to concrete pavement of 2.44km, and maintenance and repair works of a 25m concrete bridge .
The project is funded by the Kreditanstalt für Wiederaufbau (KfW).
Related
-
Boskalis wins contract to install 149 km of inter-array cables at the Zeevonk offshore wind farm in the Netherlands
13 October 2026
-
Dubai picks contractor for Al-Maktoum airport terminal
10 October 2026
-
Contractor wins $208m Almoosa hospital MEP contract
24 September 2026
-
Saudi Arabia tenders Dariya-Afif road dualisation
23 September 2026
-
Actis launches renewable energy platform in Mexico
21 September 2026
-
Sacyr selected for Second Concession of Route 57 Santiago - Colina - Los Andes in Chile
14 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2