Saudi Arabia announces pre-qualified companies for highway PPP Project
19 August 2025
The Roads General Authority, in collaboration with the National Center for Privatization & PPP (NCP) and Aseer Development Authority (ASDA), announces the names of the consortiums that prequalified for the Aseer–Jazan pivotal Road.
Following are the list of Consortia:
- IC ICTAS INSAAT SANAYI VE TICARET A.S. (Turkey), Al Gihaz Holding Company
- Safari Company, Lamar Holding, SCEGC NO.2 CONSTRUCTION ENGINEERING GROUP COMPAMY LTD.
- China Harbour Engineering Company (China), Vision International Investment Company (Vision Invest)
- Makyol İnşaat Sanayi Turizm ve Ticaret A.Ş. (Turkey), Shibh Al Jazira Contracting Company (SAJCO), Tamasuk Holding Company
- Al-Ayuni Investment & Contracting Co., Limak Group of Companies (Turkey), Samsung C&T (South Korea), Nesma and Partners Contracting Company, Plenary Group (Australia)
The length of the highway is 136 km (3 lanes in each direction) and its spans from Al Farah area in Aseer region to the Red Sea through Jazan region. It Consist of 6 intersections, 57 bridges with total lengths 18 km, 11 tunnels with total lengths 9.2 km.
The Contract type is Design-Build-Finance-Operate-Maintain (DBFOM) and duration of the contract is 30 years.
Related
-
Iberdrola to buy majority stake in Finnish power distributor Caruna
24 July 2026
-
Trinasolar and Al-Raebi to explore 1.5GW solar pipeline in Yemen
23 July 2026
-
Vestas acquires St Patricks Plains Wind Farm in Tasmania
15 July 2026
-
Mitsubishi Power wins contract for Saudi dual-fuel boiler project
15 July 2026
-
Morocco to invest $300m in Casablanca port expansion
13 July 2026
-
ACCIONA Energía completes the sale of 64 MW hydro portfolio to White Summit Capital
10 July 2026


京公网安备
11010802030424号
京ICP备19046776号-2