Egypt’s Elsewedy Electric to supply power solutions for first resort in Ras El Hekma
23 June 2025
Elsewedy Electric announced on Thursday that it has been selected by Abu Dhabi-based developer Modon Holding to provide power infrastructure for the first resort in Ras El Hekma mega project.
The ADX-listed Modon Holding was appointed as the master developer for Ras El Hekma by ADQ Holding in October 2024.
Elsewedy Electric, listed on the EGX, said in a statement that it will supply advanced dry-type transformers and install high-performance Busway systems as part of the resort’s energy infrastructure.
The resort is currently under construction and forms part of a broader investment strategy to transform Ras El Hekma into a high-end coastal destination, the statement noted.
In addition to being master developer for Ras Al Hekma's 170 million square metres (sqm) area, Modon Holding is also the developer for the first phase of the city consisting of 50 million sqm.
Related
-
Syria signs deal for 5GW power projects
12 November 2025
-
Dewa invites bids for MBR Solar Park phase seven
9 November 2025
-
EDF and others achieve financial close on two solar projects in Saudi Arabia
8 November 2025
-
JA Solar to supply PV modules for 1.2GW Uzbek solar projects
8 November 2025
-
OMV, Masdar to build 140 MW green hydrogen plant in Austria
7 November 2025
-
Jordan to tender second phosphate rail line project
7 November 2025


京公网安备
11010802030424号
京ICP备19046776号-2