SYSTRA to design the third longest road tunnel in Norway
8 May 2025
SYSTRA has just won a Design & Build contract in Norway. The contract is for a road tunnel in Vestland County, in the west of the country.
With this new project, SYSTRA is capitalising on its experience of tunnels in Norway, already gained with railway projects (Follo line and Vestfold line), a water project (E6 Rentvannstunnel) and a road project (Road Fv. 475 Neskilen – Heftingsdalen). The contractors are Metrostav Norge AS and Bertelsen & Garpestad AS and the Owner is the Norwegian Public Roads Administration, Statens Vegvesen. Our DJV partner is Ramboll.
At 12.4km, the Røldal Tunnel will be Norway’s third longest road tunnel, linking Røldal to Seljestad on the E134 motorway.
Related
-
Riyadh launches Qiddiya high-speed rail project
24 September 2025
-
Banks fund $65 million for 100 MW solar project in Turkey
24 September 2025
-
EBRD to provide $74.1m in funding for Ras Ghareb wind farm in Egypt
21 September 2025
-
Serbia in talks with Rosatom on nuclear power plant project
21 September 2025
-
VINCI wins the electrification contract on the Rail Baltica project
21 September 2025
-
Nigeria to establish 1 GW solar panel factory
21 September 2025