Egypt signs key contracts for Red Sea petrochemicals complex
18 April 2025
Prime Minister Mostafa Madbouli attended Thursday 17/4/2025 the signing ceremony of a package of contracts awarded to the Egyptian-Chinese joint venture tasked with executing the basic design works for phase one of the Red Sea Petrochemicals Complex in Ain Sokhna.
The agreement involves the Red Sea National Petrochemicals Company, China National Chemical Engineering Co., Ltd. (CNCEC), ENPPI, and Petrojet.
Located 10 kilometers from Sokhna Port, the project aims to produce a range of petrochemical products through an advanced oil refinery and steam cracking units, enabling the production of ethylene and propylene.
The initiative aligns with Egypt’s efforts to drive a green transformation in the petrochemical sector, enhance environmental sustainability, reduce the carbon footprint, and promote energy efficiency, all in line with the Sustainable Development Strategy and Egypt Vision 2030.
The project also supports the national agenda of localizing industry and increasing value-added contributions to the economy to boost investor and financial institution confidence, helping to secure funding for subsequent implementation phases, while improving the project’s ability to adhere to timelines and achieve strategic goals.
Completing the design phase will allow for a more precise estimation of the project’s actual cost, an essential step toward securing the required financing and achieving financial closure, paving the way for construction to begin in 2026 and the launch of commercial operations thereafter.
Related
-
Suzlon Wins Its First 200 MW Wind Order From Ayana Renewable Power
9 September 2026
-
Firmus to provide OpenAI with compute capacity in Malaysia
9 September 2026
-
Chinese firm to set up $300m anode facility in the UAE
8 September 2026
-
Sungrow launches 10GWh Egypt energy storage facility
7 September 2026
-
Amazon signs first APAC battery storage tolling deal with Anza Power in Victoria, Australia
4 September 2026
-
Gradiant to deliver HyperSolved water treatment system for West Texas data center
3 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2