Riyadh Launches $2.1 billion Road Development Program
5 February 2025
The Royal Commission for Riyadh City (RCRC) has announced the commencement of eight projects under the second phase of the Main and Ring Road Development Program, with a total cost of over SAR 8 billion.
Launched by His Royal Highness the Crown Prince, Prime Minister, and RCRC Chairman, the Ring Roads Axes Development Program is designed to enhance Riyadh’s main and ring roads, improve the city’s transportation network, and enhance connectivity across its regions. This initiative aligns with the objectives of Saudi Arabia’s Vision 2030, positioning Riyadh as a leading global metropolis and a central hub for sustainable transportation and logistics in the Middle East.
The eight projects included in the second phase are:
- Prince Turki bin Abdulaziz Al-Awwal Road Development Project (Northern Section) – 6 km: The project features the development of two major intersections, three bridges, and a tunnel, enhancing road capacity to accommodate 200,000 vehicles per day.
- Al-Thumama Road Axis Development Project (Central Section) – 10 km: The project features the development of five main intersections, 11 bridges, and five tunnels, increasing the road’s capacity to 200,000 vehicles per day.
- Imam Abdullah bin Saud Road Development Project – 9 km: The project features the development of four primary intersections, three bridges, and two tunnels, optimizing traffic flow and expanding the road’s capacity to 200,000 vehicles per day.
- Dirab Road Development Project – 9 km: The project features the development of two main intersections and nine bridges, boosting road capacity to 340,000 vehicles per day .
- Imam Muslim Road Development Project – 12 km: The project features the development of four main intersections and four bridges. Designed as the future southern extension of Prince Turki bin Abdulaziz Al-Awwal Road Axis, the project will enhance traffic efficiency and increase capacity to 200,000 vehicles per day.
- KAFD Surrounding Road Network Development Project – 20 km: The project features the development of three intersections and 19 bridges, easing access to King Abdullah Financial District.
- Bridge Construction at King Salman Road and Abu Bakr Al Siddiq Road Intersection: The project features the development of a bridge connecting King Salman Road in the east to Abu Bakr Al Siddiq Road in the north to streamline traffic flow and enhance mobility
- Engineering Modifications for High-Congestion Areas (First Batch): The project features the development of targeted engineering solutions to alleviate congestion and enhance overall traffic flow during peak hours.
The Royal Commission for Riyadh City is working closely with relevant authorities to ensure smooth traffic flow throughout the execution of the Second Phase Projects, which are expected to be completed within approximately three years.
RCRC previously launched the first phase of the program on August 14, 2024, comprising four projects with a total cost of SAR 13 billion. The timeline for the subsequent phases will be announced in due course., statement mentioned.
Related
-
Sabey Data Centers signs 10-year Texas solar agreement covering 43.5 MW
19 November 2026
-
$900bn Anthropic Data Centre Construction Bet Shapes AI Infrastructure Expansion
19 November 2026
-
$785M Los Alamos Computing Facility advances towards construction approval in University of Michigan
19 November 2026
-
Intermountain Health Breaks Ground on New 521,000-Square-Foot LDS Hospital in Salt Lake City
19 November 2026
-
Oil and gas discovery in the North Sea adding volumes to Oseberg
18 November 2026
-
Collaborating to develop challenging discoveries
18 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2