Dubai invites IPP advisory services for 1,600MW Solar PV with 1,000MW Energy Storage System
17 November 2024
Dubai Electricity and Water Authority (DEWA), UAE invites bids for advisory services of the Solar Photovoltaic (PV) along with Battery Energy Storage system.
The proposed rating of the Solar PV Project will be 1,600 megawatt (MW) and capacity of Battery Energy Storage System (BESS) will be 1,000 MW with six hours storage.
The Project will be constructed on Independent Power Producer (IPP) model.
Interested Bidders can submit their proposal by 17 December 2024
Related
-
EU opens €600 million call for cross-border energy infrastructure projects
7 April 2025
-
Fortescue proposes 644 MW solar farm for Australian iron ore mine
4 April 2025
-
Scatec signs long-term PPA for 120MW solar project in Tunisia
3 April 2025
-
Astronergy to build $500 million solar cell factory in Turkey
3 April 2025
-
Alstom to deliver Avelia Horizon trains to Morocco under $845m contract
3 April 2025
-
Philippine province approves 300 MW of solar
2 April 2025