Dubai invites IPP advisory services for 1,600MW Solar PV with 1,000MW Energy Storage System
17 November 2024
Dubai Electricity and Water Authority (DEWA), UAE invites bids for advisory services of the Solar Photovoltaic (PV) along with Battery Energy Storage system.
The proposed rating of the Solar PV Project will be 1,600 megawatt (MW) and capacity of Battery Energy Storage System (BESS) will be 1,000 MW with six hours storage.
The Project will be constructed on Independent Power Producer (IPP) model.
Interested Bidders can submit their proposal by 17 December 2024
Related
-
Wabtec secures $4.2bn locomotive order from Kazakhstan
29 September 2025
-
Mexico launches tender for 300 MW solar plant
28 September 2025
-
Namibia approves 3 GW of solar for hydrogen production
28 September 2025
-
Qatar Tourism and Ashghal tender West Bay waterfront PPP
26 September 2025
-
Solarvest and Brookfield join forces for 1.5GW Malaysian solar and BES projects
25 September 2025
-
Riyadh launches Qiddiya high-speed rail project
24 September 2025