Nooter/Eriksen Milan awarded major supply contract for 3.6GW Taiba-2, Qassim-2 Power Plants
16 November 2024
Nooter/Eriksen Milan, Italy announced in a statement that it has awarded major multi-million-dollar contract in the Kingdom of Saudi Arabia.
The project includes the engineering and supply of six HRSGs downstream of HL-class gas turbines, to be installed at the 1,800 MW Taiba2 and 1,800 MW Qassim2 power plants.
Once fully operational in 2027, these will be the first power plants in the Kingdom designed with provisions for carbon capture technology, marking a significant step forward in sustainable energy production.
The company stated that, we are honored to help shape a cleaner, more sustainable energy future for the Kingdom in line with Vision 2030 and the Saudi Green Initiative. Together with our customer, we’re powering a legacy of innovation and sustainability for generations to come.
Related
-
Ahold Delhaize and Rezolv Energy sign ten-year virtual PPA
7 November 2026
-
Ignitis starts operations at 173.6MW Tume solar farm in Latvia
7 November 2026
-
Alternergy Energizes 64 MW Alabat Wind Farm in the Philippines Ahead of Amihan Season
6 November 2026
-
Exergy to supply 33-MWe Maren Maras geothermal power plant in Aydin, Türkiye
6 November 2026
-
Syria, Saudi Arabia sign defence cooperation deal, agree $403m in loans
6 November 2026
-
$1.39bn Ruwais Terminal Ammonia Financing Advances Two Major Construction Projects in Abu Dhabi
6 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2