Romania's utility group Electrica to build 70MWh power storage facility
25 September 2024
Romanian utility group Electrica (BVB: EL), with the state as the main shareholder (49.8%), announced it would develop a 70MWh storage capacity in the central part of the country at Fantanele, Mures County.
The project involves EUR 22 million of investments (VAT excluded), of which EUR 3.4 million will be obtained as a grant under the Resilience Facility.
This is an important project given that the Romanian energy system is facing ever-increasing imbalances, which are expected to grow even more with the installation of new renewable energy capacities.
"The main emergency of the national energy system is storage," said the minister of energy, Sebastian Burduja, in April.
This is the second project through which Electrica accesses funds through PNRR, after in October 2023, it obtained financing for the Satu-Mare 2 photovoltaic project (developed by its subsidiary Sunwind Energy SRL), with an installed capacity of approximately 27 MWp, a project which is planned to be completed this year.
Related
-
Uganda switches on 24 MW solar project
16 September 2026
-
Tender – Geophysical investigations for geothermal exploration in Brabant Massif, Belgium
16 September 2026
-
GE Vernova to supply 29.4 MW of wind capacity for Eurus Energy’s Hiyamizutouge Project in Japan
16 September 2026
-
Renewables in Europe: TotalEnergies Acquires Shell's Renewables Business and Sells a 50% Stake in a Portfolio of Developed Assets to KKR
15 September 2026
-
Germany: Nordex secures 34 MW order for Rauschenberg wind farm
15 September 2026
-
Sacyr selected for Second Concession of Route 57 Santiago - Colina - Los Andes in Chile
14 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2