Brazil: Final Investment Decision for Atapu-2 and Sépia-2 Oil Developments
30 May 2024TotalEnergies, together with the operator Petrobras and their partners in the Atapu and Sépia consortiums, have taken the Final Investment Decision (FID) for the second development phase of Atapu and Sépia fields, located in the prolific pre-salt Santos Basin, offshore Brazil.
The Atapu field has been producing since 2020 through the P-70 Floating Production Storage and Offloading (FPSO) unit, with a production capacity of 150,000 barrels of oil per day (bopd). The second development phase, Atapu-2, will comprise a new-built FPSO of 225,000 bopd capacity. TotalEnergies owns an interest of 15% in the Atapu field, in partnership with Petrobras (65.7%, operator), Shell (16.7%), Petrogal (1.7%) and PPSA (0.9%).
The Sépia field has been producing since 2021 through the Carioca FPSO unit, with a production capacity of 180,000 bopd. The second development phase, Sépia-2, will also comprise a new-built FPSO of 225,000 bopd capacity. TotalEnergies owns an interest of 16.9% in the Sépia field, in partnership with Petrobras (55.3%, operator), Petronas (12.7%), QatarEnergy (12.7%) and Petrogal (2.4%).
The two FPSOs are expected to start producing as from 2029. They have been designed to minimize greenhouse gas emissions through an all-electric configuration and technologies such as waste heat recovery, closed flare, cargo oil tank gas recovery and variable speed drive for compressors and pumps.
“The decision to launch Sépia-2 and Atapu-2 is a new milestone in our strong growth story in Brazil, a core area for the Company thanks to its world-class low-emission and low-cost oil resources” declared Nicolas Terraz, President Exploration & Production of TotalEnergies. “Following the startup of Mero-2 in late 2023 and the upcoming startups of Mero-3 in 2024 and Mero-4 in 2025, Brazil will soon account for more than 200,000 barrels of oil equivalent per day (boepd) in equity production for the Company. At their plateau Sépia-2 and Atapu-2, the tenth and eleventh FPSO for TotalEnergies in Brazil, will contribute to maintain TotalEnergies production in this key country above 200,000 boepd.”
Related
-
Saudi Arabia commissions its largest battery energy storage system
8 February 2025
-
Ørsted cuts 2030 investment programme 25% due to rising costs
7 February 2025
-
Canyon gains Cameroon’s approval for inland rail facility for Bauxite project
7 February 2025
-
ENGIE secures 4.3GW in PPA deals for 2024
6 February 2025
-
Guyana approves next step for gas-to-energy plant
6 February 2025
-
Uganda opens tender for 40 MW of ground-mounted solar
6 February 2025