Construction begins on €800m BMW battery plant in Mexico
8 May 2024BMW has announced that construction has begun on an expansion of its factory in San Luis Potosí, central Mexico.
The 80,000 sq m extension will make high-voltage batteries for the company’s Neue Klasse line, which BMW says will have faster charging speeds and extend the cars’ ranges by 30%.
Milan Nedeljković, head of production the German car-maker, said in a press statement that the plant would become part of BMW’s global production network for EVs.
He said: “For our new sixth-generation e-drive alone, we are building five locations on three continents. Locating battery factories close to vehicle manufacturing makes production more resilient.”
In 2018, BMW announced it would build an assembly plant in Hungary, which will also manufacture Neue Klasse vehicles when it opens in 2025.
The plant in San Luis Potosí began production in 2019, with employees working on petrol cars. Nicole Haft-Zboril, BMW’s head of real estate management, said: “In Mexico, we are planning to expand the photovoltaic systems within the plant, to double the output from the solar panels.
“The plan is to generate more than 20% of the electricity we need at the moment directly on the factory premises."
Related
-
Skanska invests about SEK 530M in residential project in Täby north of Stockholm, Sweden
29 November 2024
-
Deme-led consortium to build €300m terminal at German port of Cuxhaven
29 November 2024
-
ENERCON to install 2.5GW onshore wind capacity in Turkey
29 November 2024
-
Construction begins on Russia’s largest wind farm
29 November 2024
-
North Macedonia kicks off 30 MW solar tender
29 November 2024
-
Serbia opens second renewables auction, tenders 124.8 MW of solar
29 November 2024