Tutor Perini subsidiary wins $136m Illinois road and bridge contract
22 March 2024
Lunda Construction, a subsidiary of American contractor Tutor Perini, has entered the lowest bid for a bridge replacement and highway improvement project on the border between Illinois and Indiana.
The company bid $136m for the project, which was let by the Illinois Department of Transportation.
It involves 2.5km of work along Interstate 64 near Grayville, Illinois. This will include the replacement of dual bridges over the Wabash River on the boundary between the states.
Construction is due to begin in the third quarter of 2024, with substantial completion in the fourth quarter of 2029.
Related
-
Xinyi Glass signed glass production project with Saudi’s MODON
15 January 2026
-
Engie wins SECI bid for 200MW solar PV-600MWh battery project in India
15 January 2026
-
Webuild-led team lands Riyadh Red Line extension
14 January 2026
-
Ecuador plans 2.1 GW power auction with high share of solar
12 January 2026
-
Montenegro gets €175m from EU to modernise rail
11 January 2026
-
Chinese contractor wins Wasl Jumeirah Golf Estates deal
11 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2