Oman issues RFQ for the Development of Wind IPPs
19 March 2024Nama Power and Water Procurement (PWP), Oman announced the launch of the qualification process for the potential development of wind Projects on IPP model.
In line with Sultanate of Oman vision to diversify fuel sources and achieving net zero target by 2050 through the use of clean energy for power generation, PWP is planning to develop five Wind projects with a cumulative capacity of around 1000 MW at various location (“Wind IPPs” or “Projects”) in partnership with the private sector, projects details below:

PWP is announcing the launch of the qualification process for interested developers through the issuance of the Request for Qualification (RFQ) document.
Interesred Bidders need to submit Statement of Qualification by 08 May 2024, before 12pm (Gulf Standard Time).
Related
-
Daewoo pulls out of Libya upstream tender
5 March 2026
-
Argentina tenders 700 MW of battery storage nationwide
4 March 2026
-
Local firm to develop $598m Muscat tourism project
4 March 2026
-
Greenvolt Power secures $410m for wind project construction in Romania
3 March 2026
-
Exus Renewables to acquire stake in Masdar’s Portuguese wind portfolio
3 March 2026
-
Iberdrola sells 757MW French onshore renewables portfolio to Technique Solaire
3 March 2026


京公网安备
11010802030424号
京ICP备19046776号-2