Albania: TAP technical evaluation contract awarded
12 March 2024
The Albanian Gas Service Company has awarded technical evaluation provider Tech Inspect a 405,000 euro contract for the assessment of the natural gas Trans Adriatic Pipeline (TAP) in the Albanian territory.
Tech Inspect won the deal with an offer lower than the estimated 1.55 million euros budget, AGSco said in a tender winner announcement.
The evaluation is part of TAP’s maintenance plan for its gas transmission infrastructure in Albania, according to the tender notice. It should be completed by September 2025.
AGSco is in charge of the maintenance of TAP on Albanian territory. The Albanian government holds 75% of its shares and the remaining stake is owned by Italian energy infrastructure company Snam.
TAP, is a key segment of the Southern Gas Corridor and it transports natural gas from Azerbaijan to Europe through Greece, Albania, and the Adriatic Sea to Italy.
Related
-
UK: TotalEnergies acquires a pipeline of solar and battery projects
9 June 2025
-
750 MWh Chilean battery achieve environmental approval
9 June 2025
-
Algeria awards $500mln steel deal to Chinese firm
6 June 2025
-
Comfily Hong Kong to establish $20mln integrated industrial complex in Egypt
6 June 2025
-
EIB to provide €400m loan for Stockholm metro expansion
6 June 2025
-
Barrick seeks World Bank arbitration on government takeover of Mali mine
5 June 2025