Zamil Steel awarded significant contract from Bahri Logistics Company
28 February 2024
Zamil Steel Pre-Engineered Buildings Company, a subsidiary of Zamil Industrial, has been awarded a significant contract from Bahri Logistics Company for the construction of the “Bahri Bonded Zone” project at Jeddah Islamic Port.
The Contract was sigbed by Nawaf Mohammed Al Zamil, the President of Zamil Steel Company, and Mohammed Mikwar, the Contract Logistics Sr. Manager at Bahri Logistics Company.
This marks a major milestone for the company, further solidifying its position as a trusted partner for large-scale and complex logistics infrastructure projects in the Kingdom of Saudi Arabia.
The project scope encompasses the design, fabrication, supply, and erection of a pre-engineered steel building with an area of approximately 37,000 square meters. The building will comprise an associated office building, a mezzanine floor, a warehouse, a mechanical roof, and utility annexes.
The structure is meticulously designed to withstand all gravity, lateral (wind and seismic), and temperature loads, ensuring exceptional durability and safety in the demanding port environment.
The “Bahri Bonded Zone” project is a leading initiative to establish a world-class logistics hub within the Kingdom of Saudi Arabia.
Zamil Steel Pre-Engineered Buildings Company is committed to deploying its extensive expertise and resources to deliver this prestigious project on time in September 2024 and within budget while adhering to the highest standards of quality and excellence, statement mentioned.
Related
-
Consortium signs EPC contract for Rabigh 2 IPP expansion
14 October 2026
-
CIMIC Group's Sedgman awarded contract for Jervois Copper Project in Australia
14 October 2026
-
Sumitomo Acquires 49% of Hero Group's 500 MWp Solar-Wind Project with Storage
13 October 2026
-
Alstom, Vingroup to supply up to 200 metro trains for Hanoi
13 October 2026
-
Discovery to acquire McEwen’s Timmins mineral assets for $55m
13 October 2026
-
Boskalis wins contract to install 149 km of inter-array cables at the Zeevonk offshore wind farm in the Netherlands
13 October 2026


京公网安备
11010802030424号
京ICP备19046776号-2