Saudi Arabia invites EOI for 136km Aseer – Jazan highway Project
21 February 2024The Roads General Authority (RGA) in collaboration with the National Center for Privatization & PPP (NCP) and Aseer Development Authority, announced the launch of the Expression of Interest (EOI) phase for the Aseer – Jazan highway project.
The tender aims to attract best in class road works companies to assure the project delivers the highest level of efficiency, service and traffic safety.
The length of the highway is 136 km (3 lanes in each direction) and its spans from Al Farah area in Aseer region to the Red Sea through Jazan region. It Consist of 6 intersections, 57 bridges with total lengths 18 km, 11 tunnels with total lengths 9.2 km.
The Contract type is DBFOM and duration of the contract is 30 years.
Intrested Bidders need to submit the EOI by 19 March 2024.
Related
-
Saudi-Chinese joint venture to set up manufacturing facility in Kingdom
22 August 2025
-
Masdar and consortium partners achieve financial close for 2GW Al Sadawi Solar Project
20 August 2025
-
Dubai hosts second meeting with $22bn tunnels bidders
20 August 2025
-
Chinese firm wins $298m Saudi cement plant deal
20 August 2025
-
Saudi Arabia announces pre-qualified companies for highway PPP Project
19 August 2025
-
SEC awards 1,000 MW battery energy storage system projects
18 August 2025