Saudi Arabia invites EOI for 136km Aseer – Jazan highway Project
21 February 2024The Roads General Authority (RGA) in collaboration with the National Center for Privatization & PPP (NCP) and Aseer Development Authority, announced the launch of the Expression of Interest (EOI) phase for the Aseer – Jazan highway project.
The tender aims to attract best in class road works companies to assure the project delivers the highest level of efficiency, service and traffic safety.
The length of the highway is 136 km (3 lanes in each direction) and its spans from Al Farah area in Aseer region to the Red Sea through Jazan region. It Consist of 6 intersections, 57 bridges with total lengths 18 km, 11 tunnels with total lengths 9.2 km.
The Contract type is DBFOM and duration of the contract is 30 years.
Intrested Bidders need to submit the EOI by 19 March 2024.
Related
-
Bouygues-led team picked for $3bn Vancouver tunnel
26 July 2024
-
Albawani, Urbacon Saudi JV awarded $2.1 billion Contract from Diriyah Co.
26 July 2024
-
Dubai begins $22bn tunnels developer prequalification
26 July 2024
-
EWEC issues RFP for 2.5GW Taweelah C IPP Project
26 July 2024
-
Diriyah awards multibillion construction contract
25 July 2024
-
First BRT Project Undertaken by CGGC in Côte d’Ivoire Breaks Ground
25 July 2024