Tender issued for US$435 million Airport Expansion PPP in Thailand
14 January 2024
U-Tapao International Airport Second Runway and Taxiways Project Management Unit (UTPRW-PMU) has invited bidders for the construction of the Second Runway and Taxiways at U-Tapao International Airport in Thailand.
The scope of the tender involves the construction of a second runway and taxiway, including the development of a 3,505-m by 60-m runway capable of accommodating all aircraft models. The new runway will be constructed parallel to the existing one, approximately 1,140 m away. The construction encompasses necessary earthworks, site preparation, taxiway, drainage system and structure, visual aid system, airfield ground lighting system, and a pump station.
The estimated procurement cost for this project is THB 15 billion (US$ 435 million), with funding from Asian Infrastructure Investment Bank (AIIB) loan covering 85% of the procurement cost and the Government of the Kingdom of Thailand providing a 15% counterpart fund. The government has sought a US$428.05 million loan from the AIIB for the U-Tapao International Airport Expansion Project, to utilize a portion of the funds for payments under the contract.
Tenders must be delivered to the address before March 04, 2024.
Related
-
Strabag to build Slovenia’s tallest office building
8 October 2025
-
CPB Contractors to build Australian primary school
6 October 2025
-
Eni to invest $8bn in Egypt’s energy sector
1 October 2025
-
China’s Asia-Potash plans $1.6bln fertiliser complex in Algeria
30 September 2025
-
Qatar’s UCC Holding announces the launch of Damascus International Airport Project
29 September 2025
-
Wabtec secures $4.2bn locomotive order from Kazakhstan
29 September 2025