Croatia: INA to build €40 million biogas power plant
10 January 2024
Croatian oil and gas company INA plans to invest 40 million euros in a biogas, biomethane plant using agricultural waste. The company announced that it seeks to transform the Sisak industrial zone into a renewable energy centre.
INA, which used to run a loss-making petroleum refinery in Sisak, plans to self-finance the majority of the project and seeks co-financing from the European Union’s Recovery and Resilience Facility.
The company is in the process of selecting contractors for facility design and construction and obtaining internal approvals.
A sufficient quantity of agricultural waste materials for the facility has been identified, and agreements have been signed with potential suppliers. Once final approvals for the facility construction are granted, commercial contracts will be offered to the material suppliers.
These types of facilities usually take between two and three years to build, the company noted.
INA has already built a 2.6 MW solar power plant in Sisak, which is in trial operation. Additionally, other projects involving renewable energy sources are under consideration.
In May, INA launched a trial operation of a 10.2 MW solar power plant in Virje, in the northern Koprivnica-Krizevci County in line with its drive to transition to renewable energy sources. Back then, INA announced plans to explore geothermal energy, produce green hydrogen, advance projects for continuous carbon dioxide storage, and assess the potential of wind energy in the Adriatic Sea.
Related
-
North Macedonia’s draft law envisages renewable energy auctions for CfDs
21 August 2025
-
Chinese firm wins $298m Saudi cement plant deal
20 August 2025
-
Egypt signs $1bln deal with China's Sailun group for tyre factory
19 August 2025
-
SEC awards 1,000 MW battery energy storage system projects
18 August 2025
-
SCZone inks $85mln Chinese flooring, wall panels project in Sokhna
18 August 2025
-
Morocco launches tender for hybrid power plant
18 August 2025