Skanska wins $834m Washington I-405 corridor contract
6 September 2023Skanska has signed an $834m contract with the Washington State Department of Transportation to expand and improve a 7.2km section of the I-405 corridor in Bothell.
The project will create a dual express toll lane system from south of the I-405/SR 522 interchange to the I-405/SR 527 interchange.
Work on the project includes building lanes, direct access ramps, interchange improvements, bus infrastructure and fish passage culverts.
Construction is due to begin in November and with be completed in late 2028.
Related
-
CJIC won the Bid of National Road Climate Resilient Rehabilitation and Maintenance in NR2W Section 3 (Km 121+000-Km 136+033)
10 October 2025
-
Strabag to build Slovenia’s tallest office building
8 October 2025
-
Iran signs SMR deal with Russia
27 September 2025
-
Chinese contractor signs $2.5bn Iraq pipeline project
26 September 2025
-
Solarvest and Brookfield join forces for 1.5GW Malaysian solar and BES projects
25 September 2025
-
VINCI wins the electrification contract on the Rail Baltica project
21 September 2025