Skanska wins $834m Washington I-405 corridor contract
6 September 2023
Skanska has signed an $834m contract with the Washington State Department of Transportation to expand and improve a 7.2km section of the I-405 corridor in Bothell.
The project will create a dual express toll lane system from south of the I-405/SR 522 interchange to the I-405/SR 527 interchange.
Work on the project includes building lanes, direct access ramps, interchange improvements, bus infrastructure and fish passage culverts.
Construction is due to begin in November and with be completed in late 2028.
Related
-
Envision Energy, AMEA Power sign deal for 500MW Egypt wind project
22 June 2026
-
Montenegro’s CEDIS signs agreement with EDF, AFD on grid upgrade
12 June 2026
-
Consortium wins Ajman sewage treatment contract
11 June 2026
-
Saudi Arabia and Turkiye sign railway agreements
11 June 2026
-
Amea Power signs 1.5GWh battery storage EPC contracts
9 June 2026
-
Acwa signed COL with BCDA for 500-MW solar-plus-storage project in Philippines
5 June 2026


京公网安备
11010802030424号
京ICP备19046776号-2