Bolivia’s YLB signs lithium agreements with Russian and Chinese companies
3 July 2023
Bolivian state company Yacimientos de Litio Bolivianos (YLB) has signed framework agreements with Russia-based Uranium One Group and China’s Citic Guoan Group to develop lithium resources in the country.
The two deals involve a total investment of $1.4bn ($b9.67bn) to unlock Bolivia’s lithium reserves, which are among the most abundant in the world.
The investment envisages the development of two direct lithium extraction (DLE) processing plants in Pasto Grande and Uyuni Norte. The DLE plants are expected to produce at least 45,000 tonnes per annum (tpa) of lithium carbonate.
Bolivia’s Minister of Hydrocarbons and Energy Franklin Molina was quoted by Reuters as saying at an event in La Paz: “With these deals, our country will be able to produce some 100,000 (metric) tons of lithium carbonate in 2025 in the Uyuni, Coipasa and Pasto Grandes salt flats.”
Bolivia’s salt flats are estimated to hold what are reputed to be the world’s largest lithium resources, comprising 21 million tonnes, according to the US Geological Survey.
A unit of Russian state nuclear company Rosatom, Uranium One Group plans to invest $600m (Rbs52.7bn) in the project with a production capacity of 25,000tpa of lithium carbonate and a potential for further production expansion based on the results of geological exploration activities.
Molina said that Citic Guoan is planning to invest $857m (6.22bn yuan). The Chinese company is also expected to “look at investing in battery plants and the installation, possibly with technical studies, of a vehicle assembly plant, to create a true electric transport revolution”.
Related
-
Ahold Delhaize and Rezolv Energy sign ten-year virtual PPA
7 November 2026
-
Fluor to proceed with Sierra Gorda grinding line project in Chile
5 November 2026
-
Freeport to invest $4.5bn in Bagdad project expansion
5 November 2026
-
Venture Global awards Worley EPC contract for CP2 Expansion project
5 November 2026
-
First and Second Kazakhstan Nuclear Power Plants Target 2035 Completion
5 November 2026
-
Cadeler wins contract for 1.2GW Dogger Bank C offshore turbine installation
5 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2