French engineer prepares ground for 20GW of solar in Saudi’s Neom
29 June 2023
Saudi Arabia has hired Paris-based engineering group Assystem to conduct pre-development studies for seven photovoltaic parks in the Tabuk and Duba regions to power the kingdom’s Neom economic development zone.
In all, the solar parks stretch over 420 sq km, potentially providing more than 20GW of generating capacity, Assystem said.
The company will do site assessment studies, preliminary design, master planning, environmental and social impact assessments, and permitting studies.
It noted that the International Energy Agency calculates that solar is set to account for the largest share of power generated by 2027.
“This project marks one of the first steps towards realising the deployment of solar PV on a truly massive scale,” said Kerem Sadiklar, Assystem’s head of siting and environmental services.
Related
-
PPC, Metlen ink regional deal for 1.5 GW in batteries
11 March 2026
-
Consortia Qualified for Jeddah–Makkah Direct Highway PPP Project Announced
11 March 2026
-
Nordex wins order for 40 turbines for German wind farms
11 March 2026
-
A strategic agreement signed with CNPC for drilling 30 Uzbekistan wells
11 March 2026
-
Firm signs $120m Egypt new capital industrial complex deal
10 March 2026
-
Skanska wins two Scandinavian contracts worth €87m
8 March 2026


京公网安备
11010802030424号
京ICP备19046776号-2