Studies conducted for USD515.7 million Road PPP project in Colombia
20 April 2023
The National Infrastructure Agency (ANI) has announced that additional geological and geotechnical studies of the Bogotá - Girardot road PPP-PI project (4G) are progressing on the hillsides in the Azafran sector, municipality of Sylvania.
The studies include the analysis and assessment of the area from the top of the slope to the bottom of the channel, as well as the strip parallel to the road and areas with the highest traffic between PK 05 +200 and PK10 + 100 of functional block 6. The purpose of the studies is to assess the vulnerability of structures that can be damaged or that can cause human damage. About 130 houses have been affected by the vulnerability of the sites, they will be provided with comprehensive solutions after receiving the study report. The results of the study will be ready in 6 months, they will be ready on June 23, 2023.
The project involves the design, financing, construction, operation and maintenance of the 144 km of highway, including the addition of 69 km of third lanes and the construction of 2 km of 4 bidirectional tunnels. The project as of today includes 2 major intersections, a 4.2 km tunnel, 17 bridges, 34 pedestrian bridges, 4 viaducts and 2 operational centers.
Related
-
Tender issued for Libyan gas project
19 September 2026
-
Zambia inks PPA for 500 MW solar project
19 September 2026
-
reNIKOLA and Syarikat SESCO Sign 363 MWp Solar PPA in Sarawak
18 September 2026
-
Metito wins O&M contract for Dubai South Sewage project
18 September 2026
-
Aldar and Mubadala acquire Masdar City Square
18 September 2026
-
Georgia Power gains approval for 1.14GW of new solar agreements
17 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2