India exempts some solar projects from domestic content requirements
22 March 2023
India's MNRE says solar projects commissioned by March 31, 2024, will not have to source PV modules from the Approved Models and Manufacturers (ALMM) list.
Imported module costs remain competitive compared to panels sourced from domestic manufacturers using imported solar PV cells. Prices of mono PERC modules have moderated over the past five to six months, falling from a peak in December 2022, says ICRA.
Domestic module manufacturing capacity in India has jumped significantly over the last two years. While this is positive for the solar power sector, a lack of backward integration and limited capacity for cell manufacturing are keeping module manufacturers dependent on imported PV cells.
Related
-
Philippines DoE unveils framework for carbon credits in energy sector
20 October 2025
-
Costa Rica gets $250m EIB loan for electric rail project
17 October 2025
-
Zimbabwe plans competitive bidding for electricity projects
15 October 2025
-
Malaysian utility launches rebate program for residential PV
24 September 2025
-
Philippines updates net-metering rules to ease adoption for 17,000 users
16 September 2025
-
IB Solar plans 4 GW TOPCon cell and module factory in India
16 September 2025


京公网安备
11010802030424号
京ICP备19046776号-2