Webuild Group wins $218 mln highway contract in Florida, USA
30 January 2023
The Webuild Group’s U.S. subsidiary Lane has won a $218-million (more than €202 million) contract to increase the capacity and improve the safety at an interchange at Interstate 4 (I-4) and Sand Lake Road (State Road 482) in Orange County, Florida. The interchange is part of the county’s corridor connecting tourist attractions such as Universal Studios Orlando, International Drive, Sea World, and Walt Disney World. Improvements to the interchange will contribute to the local economy by easing traffic flow, cutting travel times and reducing excess emissions of CO2.
Commissioned by the Florida Department of Transportation (FDOT), the project entails roadway improvements and preparations to install a Diverging Diamond Interchange (DDI) with I-4. There is also the replacement of two bridges, the construction of a new bridge for preferential lanes, three new access ramps, as well as the installation of a toll and signaling systems. Once completed, the revamped interchange will help minimise travel times and decrease the wait time at traffic signals.
Lane has a major presence in Florida. In Tampa, it is widening a downtown section of I-275. In the greater Orlando area in Osceola County, it is completing the Poinciana Parkway. Elsewhere in Orlando, Lane is working on a beltway at the intersection of I-4, SR 417, and the nearly completed Wekiva Parkway (SR 429).
Related
-
Strabag to build Slovenia’s tallest office building
8 October 2025
-
Iran signs SMR deal with Russia
27 September 2025
-
Chinese contractor signs $2.5bn Iraq pipeline project
26 September 2025
-
Solarvest and Brookfield join forces for 1.5GW Malaysian solar and BES projects
25 September 2025
-
VINCI wins the electrification contract on the Rail Baltica project
21 September 2025
-
Nordex enters Ecuadorian market with first order for 112 MW wind project
20 September 2025