Webuild Group wins $218 mln highway contract in Florida, USA
30 January 2023
The Webuild Group’s U.S. subsidiary Lane has won a $218-million (more than €202 million) contract to increase the capacity and improve the safety at an interchange at Interstate 4 (I-4) and Sand Lake Road (State Road 482) in Orange County, Florida. The interchange is part of the county’s corridor connecting tourist attractions such as Universal Studios Orlando, International Drive, Sea World, and Walt Disney World. Improvements to the interchange will contribute to the local economy by easing traffic flow, cutting travel times and reducing excess emissions of CO2.
Commissioned by the Florida Department of Transportation (FDOT), the project entails roadway improvements and preparations to install a Diverging Diamond Interchange (DDI) with I-4. There is also the replacement of two bridges, the construction of a new bridge for preferential lanes, three new access ramps, as well as the installation of a toll and signaling systems. Once completed, the revamped interchange will help minimise travel times and decrease the wait time at traffic signals.
Lane has a major presence in Florida. In Tampa, it is widening a downtown section of I-275. In the greater Orlando area in Osceola County, it is completing the Poinciana Parkway. Elsewhere in Orlando, Lane is working on a beltway at the intersection of I-4, SR 417, and the nearly completed Wekiva Parkway (SR 429).
Related
-
Envision Energy, AMEA Power sign deal for 500MW Egypt wind project
22 June 2026
-
Montenegro’s CEDIS signs agreement with EDF, AFD on grid upgrade
12 June 2026
-
Consortium wins Ajman sewage treatment contract
11 June 2026
-
Saudi Arabia and Turkiye sign railway agreements
11 June 2026
-
Amea Power signs 1.5GWh battery storage EPC contracts
9 June 2026
-
Acwa signed COL with BCDA for 500-MW solar-plus-storage project in Philippines
5 June 2026


京公网安备
11010802030424号
京ICP备19046776号-2