Masdar switches on 5 MW solar plant in Seychelles
22 December 2022
Masdar, an Abu Dhabi-based renewables developer, has switched on a 5 MW solar plant in the Seychelles. The Ile de Romainville project includes 3.3 MW of battery energy storage and a 33 kV system to transmit electricity to the main island of Mahe.
The Abu Dhabi Fund for Development (ADFD) financed the project, which was jointly developed by Masdar and Seychelles-based Public Utilities Corp. (PUC). It is part of the International Renewable Energy Agency (IRENA) and ADFD Project Facility, which is an initiative to scale up renewables in developing countries. It is only the second clean-energy project in the Seychelles, according to Masdar.
Masdar built the solar plant on the island of Romainville, which hosts several wind turbines from ADFD and Masdar’s Port Victoria Wind Farm. It specifically designed the PV installation to maximize the use of available land, while allowing for the maintenance of the wind turbines and minimizing shading losses, Masdar said in a statement.
“By saving about 2,000,000 liters of fossil fuel annually, Ile de Romainville solar PV plant will enable the country to significantly reduce its carbon footprint, provide a wide range of benefits to its people and empower small businesses,” said ADFD Director General Mohamed Saif Al Suwaidi. “The project will also make energy more affordable and accessible to the population.”
The Seychelles heavily relies on fossil fuels to meet its electricity demand, with fossil fuels accounting for around 20% of the country’s imports. It has set a target of 15% renewables by 2030. According to IRENA, the nation's cumulative solar capacity stood at 9 MW in 2021.
Related
-
Kuwait issues RFP for 1,100 MW Solar PV IPP Project
16 June 2025
-
AMEA Power Announces Financial Close on Egypt’s first-ever utility-scale BESS
16 June 2025
-
Morocco appoints contractors for Casablanca stadium construction
15 June 2025
-
AfDB announces $184m for solar and battery storage project in Egypt
13 June 2025
-
UCC Holding and Ashghal Launches the 3D-Printed Schools Project
13 June 2025
-
Cimic to upgrade eastern Australia’s internet infrastructure
13 June 2025