ADNOC’s Bu Hasa Flow Line Project Commenced
26 November 2022
China Petroleum Pipeline Engineering (CPP) Co., Ltd announced in a statement that the Abu Dhabi Bu Hasa Flow Line Project contracted by CPP was officially commenced.
The Abu Dhabi Bu Hasa Flow Line Project is located in the Bu Hasa Oilfield, about 200 kilometers southwest of Abu Dhabi.
The owner is Abu Dhabi Company for Onshore Oil Operations, a subsidiary of Abu Dhabi National Oil Company (ADNOC), and the largest oil producer in ADNOC Group.
The project mainly includes detailed design, procurement and construction of BQ station, typical drawing design of oil wells, gas lift wells and water injection wells, and detailed design, procurement and construction of 67 wellheads and surface pipelines.
Related
-
Dubai selects groups for $22bn sewerage tunnel deals
15 June 2026
-
Aramco issues tender for offshore pipeline work
8 June 2026
-
Chinese firm breaks ground on $1.1bn Oman battery plant
6 June 2026
-
Petrofac completes sale of Abu Dhabi business unit
3 June 2026
-
Emirates Airline awards $5bn Dubai engineering complex deal
20 May 2026
-
Abu Dhabi seeks firms for Mid Island Parkway PPP
17 May 2026


京公网安备
11010802030424号
京ICP备19046776号-2