ADNOC’s Bu Hasa Flow Line Project Commenced
26 November 2022China Petroleum Pipeline Engineering (CPP) Co., Ltd announced in a statement that the Abu Dhabi Bu Hasa Flow Line Project contracted by CPP was officially commenced.
The Abu Dhabi Bu Hasa Flow Line Project is located in the Bu Hasa Oilfield, about 200 kilometers southwest of Abu Dhabi.
The owner is Abu Dhabi Company for Onshore Oil Operations, a subsidiary of Abu Dhabi National Oil Company (ADNOC), and the largest oil producer in ADNOC Group.
The project mainly includes detailed design, procurement and construction of BQ station, typical drawing design of oil wells, gas lift wells and water injection wells, and detailed design, procurement and construction of 67 wellheads and surface pipelines.
Related
-
The Commencement Ceremony of the Outapi Water Treatment Plant Upgrade & Extension Project was held in Namibia
8 January 2025
-
L&T wins new orders (Large*) in India and abroad for Power Transmission & Distribution business
7 January 2025
-
Chinese firm confirms Aramco offshore contract awards
5 January 2025
-
Kuwait: Heisco signs $108.9 million contract with KOC
30 December 2024
-
Saudi’s ADES Holding awarded $276 million Jackup Rig Contract in Thailand
30 December 2024
-
Kyrgyzstan starts building railway linking China, Uzbekistan
29 December 2024