US offers $3bn to support Romania’s nuclear expansion
12 November 2022
The United States’ Export-Import Bank has signalled interest in offering $3.05bn to support American involvement in building two more reactors at Cernavoda, Romania’s only nuclear power station.
Bank president Reta Jo Lewis unveiled two letters of interest to Romanian utility Nuclearelectricta on Wednesday at the COP27 conference in Egypt.
Nuclearelectrica said the finance would be divided into $50m for pre-project technical services and up to $3bn for engineering and project management services.
The letters follow a memorandum of understanding, signed in October 2020, in which Exim expressed an interest in offering up to €8bn in financial support for Romanian energy projects. The move ended previous plans to hire China General Nuclear to build the reactors (see further reading).
Cernavoda presently operates two Candu 6 reactors at Cernavoda. Nuclearelectrica wants to add two Candu 9s by 2031. Candu is a Canadian-designed pressurised heavy water reactor.
Romanian president Klaus Iohannis his country’s plans to be energy self-sufficient depended on expanding nuclear and renewable capacity.
He also expressed an interest in small modular reactors, an emerging market for which a number of US companies are developing products.
The Export-Import Bank assists US exports with credit insurance, working capital guarantees, loan guarantees and direct loans.
Related
-
Study finds potential for 150 GW of additional PV at substations in Germany
22 September 2026
-
Solar module imports drop 48% in Brazil in H1
21 September 2026
-
Eurasian Development Bank: Central Asia Economy Grows by 6%
11 September 2026
-
S+B Gruppe to build data center in Bucharest, Romania
11 September 2026
-
Saudi water sector hits sharp slowdown
9 September 2026
-
Kuwait grants loan for GCC grid extension study
9 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2