Bechtel to begin work on $30bn Louisiana LNG plant in April
11 February 2022
Construction of a $30bn liquified natural gas (LNG) plant in Louisiana is to begin in April, even though the funding arrangements for the project have not yet been finalised, S&P Global Platts reports.
The Driftwood LNG production plant, which is being built by US engineer Bechtel for Driftwood Inc, a subsidiary of US energy company Tellurian, is intended to produce 28 million tonnes of LNG a year.
The plant is being built on the west bank of the Calcasieu River, south of Lake Charles.
Related
-
Masdar and Iberdrola co-invest $6bn in East Anglia THREE offshore wind farm
13 July 2025
-
New Murabba signs up South Korean firm for design works
12 July 2025
-
SkyWorld acquires Batu Kawan land for affordable housing project
11 July 2025
-
Morocco begins Casablanca airport expansion works
10 July 2025
-
Iraq shortlists 10 global bidders for Baghdad Airport PPP redevelopment project
10 July 2025
-
VINCI Construction and Colas Rail secure €100m contract in Chile
10 July 2025