Azure Power Fully Commissions Largest, Single Site 600 MW SECI Solar Project In India
4 January 2022
Azure Power, a leading independent sustainable energy solutions provider in India, today announced the successful commissioning of its largest project- 600 MWs Interstate Transmission System (ISTS) connected solar project, allocated by Solar Energy Corporation of India (SECI).
The project is in Bikaner, Rajasthan and the power generated from the project will be supplied to SECI at a tariff of INR 2.53 (~US 3.5 cents) per kWh for 25 years. This is the largest solar power project in India, owned and operated at a single location by any developer.
The project is in Bikaner, Rajasthan and the power generated from the project will be supplied to SECI at a tariff of INR 2.53 (~US 3.5 cents) per kWh for 25 years. This is the largest solar power project in India, owned and operated at a single location by any developer.
Related
-
Malaysia’s Malakoff eyes small hydropower projects in Uzbekistan’s rivers and canals
17 April 2025
-
Vietnam, China ink pivotal deals on railway, road cooperation
17 April 2025
-
European Commission approves €400m for renewable hydrogen in Spain
17 April 2025
-
Acciona, Cimic team win $3.5bn rail project in Australia
17 April 2025
-
UK Government takes control of Chinese-owned British Steel plant
17 April 2025
-
Bulgaria signs offshore oil, gas exploration deal with Shell
16 April 2025