Azure Power Fully Commissions Largest, Single Site 600 MW SECI Solar Project In India
4 January 2022
Azure Power, a leading independent sustainable energy solutions provider in India, today announced the successful commissioning of its largest project- 600 MWs Interstate Transmission System (ISTS) connected solar project, allocated by Solar Energy Corporation of India (SECI).
The project is in Bikaner, Rajasthan and the power generated from the project will be supplied to SECI at a tariff of INR 2.53 (~US 3.5 cents) per kWh for 25 years. This is the largest solar power project in India, owned and operated at a single location by any developer.
The project is in Bikaner, Rajasthan and the power generated from the project will be supplied to SECI at a tariff of INR 2.53 (~US 3.5 cents) per kWh for 25 years. This is the largest solar power project in India, owned and operated at a single location by any developer.
Related
-
Montenegro’s power utility EPCG, Masdar sign cooperation agreement
16 January 2026
-
Engie wins SECI bid for 200MW solar PV-600MWh battery project in India
15 January 2026
-
Ecuador plans 2.1 GW power auction with high share of solar
12 January 2026
-
Montenegro gets €175m from EU to modernise rail
11 January 2026
-
Cimic wins Indonesia energy infrastructure job
10 January 2026
-
Saudi Arabia qualifies developers for renewable projects
9 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2