8 GW green hydrogen project announced in Chile
6 December 2021
French renewable energy developer Total Eren has announced research plans for the development of a large-scale green hydrogen Project called “H2 Magallanes” totaling up to 10 GW of installed wind capacity. It is expected to be located near the borough of San Gregorio, in the Magallanes region, Southern Chile.
“The H2 Magallanes installed capacity coupled with up to 8 GW of electrolysis capacity, a desalination plant, an ammonia (NH3) plant, and port facilities to transport the green ammonia to national and international markets. The objective is to conduct studies in order to launch the project in 2025, aiming to produce hydrogen by 2027,” Total Eren wrote on Thursday.
Related
-
PPC, Metlen ink regional deal for 1.5 GW in batteries
11 March 2026
-
Consortia Qualified for Jeddah–Makkah Direct Highway PPP Project Announced
11 March 2026
-
Nordex wins order for 40 turbines for German wind farms
11 March 2026
-
Firm signs $120m Egypt new capital industrial complex deal
10 March 2026
-
EU opens third cross-border solar tender
6 March 2026
-
Daewoo pulls out of Libya upstream tender
5 March 2026


京公网安备
11010802030424号
京ICP备19046776号-2