8 GW green hydrogen project announced in Chile
6 December 2021
French renewable energy developer Total Eren has announced research plans for the development of a large-scale green hydrogen Project called “H2 Magallanes” totaling up to 10 GW of installed wind capacity. It is expected to be located near the borough of San Gregorio, in the Magallanes region, Southern Chile.
“The H2 Magallanes installed capacity coupled with up to 8 GW of electrolysis capacity, a desalination plant, an ammonia (NH3) plant, and port facilities to transport the green ammonia to national and international markets. The objective is to conduct studies in order to launch the project in 2025, aiming to produce hydrogen by 2027,” Total Eren wrote on Thursday.
Related
-
CIMIC Group's Sedgman awarded contract for Jervois Copper Project in Australia
14 October 2026
-
Sumitomo Acquires 49% of Hero Group's 500 MWp Solar-Wind Project with Storage
13 October 2026
-
Alstom, Vingroup to supply up to 200 metro trains for Hanoi
13 October 2026
-
Discovery to acquire McEwen’s Timmins mineral assets for $55m
13 October 2026
-
Boskalis wins contract to install 149 km of inter-array cables at the Zeevonk offshore wind farm in the Netherlands
13 October 2026
-
Eskom kicks off tender for 6 GW of renewables-plus-storage
13 October 2026


京公网安备
11010802030424号
京ICP备19046776号-2