Yucaipa Valley Water District to Save $73 Million Through Clean Energy Resiliency for Vital Water and Wastewater Assets in Partnership with ENGIE North America
8 November 2021The Yucaipa Valley Water District (YVWD) Board of Directors approved a contract with ENGIE North America for a customized solar, storage, and microgrid project. YVWD will prioritize the adoption of clean-powered energy to improve its water energy nexus at two of its most critical locations, the Yucaipa Valley Regional Water Filtration Facility, and the Wochholz Regional Water Recycling Facility.
The combined project includes 7.4 MW of solar, a 3.3 MW/13 MWh energy storage system, and 3.2 MW of natural gas gensets and microgrid controllers. YVWD's program is expected to save $73 million over the life of the program and the District will receive nearly seven million dollars in incentives under California's Self Generation Incentive Program. ENGIE North America will build, own, and operate the systems as well as sell energy and energy services through a 28-year power purchase agreement with a fixed price.
The YVWD manages more than 220 miles of drinking water pipelines and provides a combination of water, sewer, and recycled water connections to over 22,000 ratepayers in the Inland Empire. The program will greatly improve the District's capacity to serve residents and keep rates stable while hedging against rising energy costs. The program is designed to meet the District's long-term resiliency goals and ensure safe, reliable power to the District's key facilities during public safety power shutoff (PSPS) events.
Related
-
Scatec secures financing for 60 MW of solar in Botswana
21 December 2024
-
Enel to retrofit battery storage at century-old pumped hydro storage plant
20 December 2024
-
CEEC Largest Integrated Solar and Energy Storage Power Plant in Egypt Breaks Ground
20 December 2024
-
Polish capacity market auction for 2029 catalyzes gigawatts of battery storage
20 December 2024
-
ABB to acquire Gamesa Electric’s Spanish power electronics division
20 December 2024
-
MVM Group acquires majority stake in E.ON’s energy retail and customer solutions business
19 December 2024