Skanska builds new road grade separation in City of Industry, California, USA, for USD 96M, about SEK 845M
24 August 2021
Skanska has signed a contract with the San Gabriel Valley Council of Governments to serve as the contractor for the Fullerton Road Grade Separation Project in City of Industry, Southern California, USA. The contract is worth USD 96M, about SEK 845M, which will be included in the US order bookings for the third quarter of 2021.
The project will lower Fullerton Road under the existing Union Pacific railroad tracks in City of Industry, between Rowland Street and State Route 60. Additionally, a six-lane roadway underpass, four-track railroad bridge and a bridge for Railroad Street spanning Fullerton Road will be constructed.
Construction begins in third quarter 2021 with completion expected in fourth quarter 2024.
Related
-
Egypt’s Elsewedy Electric to supply power solutions for first resort in Ras El Hekma
23 June 2025
-
Envision Energy enters French energy storage market with 120 MW / 240 MWh turnkey project
23 June 2025
-
DNV wins engineering role on Abydos solar project in Egypt
20 June 2025
-
Egypt awards ACCIONA the operation and maintenance of one of the world’s largest wastewater treatment plants
19 June 2025
-
CWI signs landfill gas-to-energy project in Indonesia
18 June 2025
-
Scatec signs PPA for 900MW wind project in Egypt
17 June 2025