Construction of 223km roads linking Uganda to DRC launched
20 June 2021
President Yoweri Museveni and his counterpart Félix Tshisekedi have laid the foundation stone to mark the start of the construction works of 223km roads linking Uganda to DRC. The groundbreaking ceremony took place at Mpondwe / Kasindi border post.
This comes barely after the governments of both countries signed two agreements i.e. the Inter-Governmental Agreement (IGA), and Project Development Agreement (PDA), to facilitate the implementation of the said project the cost of which US$ 334.5M.
Scope of the project
The project includes the construction and/or rehabilitation of the Mpondwe/Kasindi- Beni road (80 Kilometers), the Bunagana- Rutshuru- Goma Road (89 kilometers), and the integration of the Beni-Butembo Axis (54 Kilometers).
It is being implemented within the framework of a public-private partnership (PPP) in which the shares in the financing are distributed as follows: the Ugandan engineering company Dott Services Ltd (60%), the government Ugandan (20%), and the Congolese government (20%).
Expectations for the project
Speaking during the groundbreaking ceremony, President Museveni recalled that the people of the Democratic Republic of Congo and those of the Republic of Uganda are linked and have existed as neighbors from time immemorial, and noted that the project will bring about a considerable socio-economic transformation of the lives of the inhabitants of the two nations.
Upon completion, this project could also double trade in Uganda, a country that makes about US$ 532M a year from trading with DRC where it exports goods such as plastics, clothing, and food products produced by domestic industries.
In DRC, the project is expected to improve interconnectivity and security particularly in the eastern region, where reportedly a number of rebel groups operate from.
Related
-
Ecuador plans 2.1 GW power auction with high share of solar
12 January 2026
-
Montenegro gets €175m from EU to modernise rail
11 January 2026
-
Cimic wins Indonesia energy infrastructure job
10 January 2026
-
Saudi Arabia qualifies developers for renewable projects
9 January 2026
-
Consultant appointed for Qatar-Bahrain causeway study
7 January 2026
-
Vestas gets 390MW wind turbine order in South Korea
5 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2