Bombardier-led consortium wins $7.4bn deal to supply rolling stock to Mexico’s Maya Line
5 June 2021Mexico’s national tourism body has awarded a consortium led by Bombardier Transportation a $7.4bn contract to provide rolling stock and control systems for its flagship Mayan Train line.
Fonatur (short for El Fondo Nacional de Fomento al Turismo) picked the Bombardier team after it offered a bid that was some $44m less than its rivals.
Bombardier Transportation was bought by French rival Alstom in January, and Alstom’s Mexican subsidiary is part of the team, along with contractor Gami Ingeniería e Instalaciones and Construcción Urales. Gami, based in Juárez, is an arm of Mexican infrastructure Grupo Indi and Construcción Urales is the Mexican subsidiary of Seville infrastructure specialist, Grupo Azvi.
The Mexican government’s map of the Mayan railway
Gami and Construcción Urales also won a contract to build the 172km third section of the Maya Line.
This latest contract, the project’s largest, is for the supply and commissioning of 42 trainsets and all the hardware and software for the line’s operational systems. It will also provide maintenance depots, and maintenance services, for the trains.
The equipment is expected to be functioning in 2023, when the 1,470km line enters service. It is being built in five sections. When complete, it will connect tourist destinations and population centres on the Yucatán peninsula.
The project is being billed by Mexican president Andrés Manuel López Obrador as the key to restarting the country’s economy after the coronavirus slump, and is also aimed at attracting investment to Mexico’s poorer southern states.
Related
-
CAF secures $453m maintenance contracts in UK and Colombia
9 May 2025
-
Scatec starts work on $590m solar and battery project
9 May 2025
-
Oman signed $564mn deal with Chinese firm to set up solar plant
9 May 2025
-
Spain commits €340 million to Casablanca desalination plant
9 May 2025
-
Rosatom suing Finnish companies for $2.8bn over terminated nuclear plant contract
7 May 2025
-
Egypt Signs $120 Million Deal for KIZAD East Port Said project
7 May 2025