TechnipFMC Receives Notice to Proceed for Subsea Contract for Santos Barossa Project Offshore Austra
27 April 2021
TechnipFMC today announced it has received a Notice to Proceed for a significant(1)subsea production system contract from Santos Ltd. (ASX: STO) for the Barossa project, located 300 kilometers north of Darwin, Australia, at a water depth of approximately 130 meters.
The contract scope covers the supply of subsea trees and associated control systems, manifolds and wellheads, as well as installation and commissioning support, which will help to extend the life of the existing Darwin LNG facility.
Jonathan Landes, President Subsea at TechnipFMC, commented: “We are very pleased to have been selected as a subsea partner for the Barossa project. This important award strengthens our relationship with Santos and further demonstrates our commitment to assist in the development of the Australian energy sector.”
(1) For TechnipFMC, a “significant” contract ranges between $75 million and $250 million.
Related
-
Victoria clears WestWind's Warracknabeal wind farm, exceeding 1.5 GW
19 October 2026
-
Helios Solar Signs MOU With Keong Hong for Renewable Energy Projects
19 October 2026
-
STRABAG consortium awarded a 219-million-euro infrastructure project in North Macedonia
18 October 2026
-
Samsung C&T Japan Signs MOU with eREX for Collaboration on Renewable Energy Projects
15 October 2026
-
Consortium signs EPC contract for Rabigh 2 IPP expansion
14 October 2026
-
CIMIC Group's Sedgman awarded contract for Jervois Copper Project in Australia
14 October 2026


京公网安备
11010802030424号
京ICP备19046776号-2