TechnipFMC Receives Notice to Proceed for Subsea Contract for Santos Barossa Project Offshore Austra
27 April 2021
TechnipFMC today announced it has received a Notice to Proceed for a significant(1)subsea production system contract from Santos Ltd. (ASX: STO) for the Barossa project, located 300 kilometers north of Darwin, Australia, at a water depth of approximately 130 meters.
The contract scope covers the supply of subsea trees and associated control systems, manifolds and wellheads, as well as installation and commissioning support, which will help to extend the life of the existing Darwin LNG facility.
Jonathan Landes, President Subsea at TechnipFMC, commented: “We are very pleased to have been selected as a subsea partner for the Barossa project. This important award strengthens our relationship with Santos and further demonstrates our commitment to assist in the development of the Australian energy sector.”
(1) For TechnipFMC, a “significant” contract ranges between $75 million and $250 million.
Related
-
ACCIONA awarded road link project in southern São Paulo
21 January 2026
-
PIF signs agreement to develop Yanbu aluminium complex
17 January 2026
-
Xinyi Glass signed glass production project with Saudi’s MODON
15 January 2026
-
Engie wins SECI bid for 200MW solar PV-600MWh battery project in India
15 January 2026
-
Webuild-led team lands Riyadh Red Line extension
14 January 2026
-
Chinese contractor wins Wasl Jumeirah Golf Estates deal
11 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2