Afcons secured EPC contracts for Jewar Link Expressway
30 October 2026
Afcons Infrastructure Ltd has secured two significant engineering,procurement and construction (EPC) contracts in Uttar Pradesh with a combined valueof nearly ₹3,469 crore, reinforcing its strong position in the transportation and urbaninfrastructure segment. The projects comprise the development of the Jewar LinkExpressway and a key underground section of the Lucknow Metro Phase-1B.
The Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) has awardedthe contract, valued at approximately ₹2,086 crore (excluding GST), for the constructionof the 24.5-km access-controlled Greenfield Jewar Link Expressway. The six-lanecorridor, expandable to eight lanes, will connect the Noida International Airport at Jewar,creating an integrated high-speed transportation network across the state.
The expressway is expected to significantly enhance airport accessibility, reduce traveltimes, and improve logistics eAiciency by linking two of Uttar Pradesh’s most importantexpressway corridors - Yamuna Expressway and Ganga Expressway. The project willsupport regional economic development while strengthening connectivity forpassengers and freight traAic across western and central Uttar Pradesh.
In addition, Afcons has received notice of award for a major contract from Uttar PradeshMetro Rail Corporation (UPMRC) for the design and construction of a 6.52-kmunderground stretch under the Lucknow Metro Phase-1B project. The scope includesseven underground metro stations, associated civil and architectural works, utilitysystems, fire safety infrastructure, and connectivity between underground and elevatedsections. The project value is approximately ₹1383 crore.
Related
-
Oil and gas discovery in the North Sea adding volumes to Oseberg
18 November 2026
-
Collaborating to develop challenging discoveries
18 November 2026
-
Equinor, Aker BP and Vår Energi join forces to search for Norway’s next major discoveries
18 November 2026
-
Further development of Johan Sverdrup
18 November 2026
-
CO₂ research project “catch4climate” officially inaugurated with 200 guests from politics and industry
18 November 2026
-
LA ABC, GOBERNACIÓN Y TRANSPORTE ACUERDAN REINICIAR TRABAJOS DE SELLADO DE JUNTAS, BERMAS Y MANTENIMIENTO CONSTANTE EN EL DESVÍO PARA REACTIVAR LA DOBLE VÍA ORURO – CHALLAPATA
18 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2