Bakassi Deep Seaport: Tinubu Flags Off $3.5 Billion Cross River Maritime Project
16 November 2026This content is the exclusive copyright of Construction Review Online (constructionreviewonline.com). Original URL: https://constructionreviewonline.com/bakassi-deep-seaport-tinubu-flags-off-3-5-billion-cross-river-maritime-project/. © 2026 Group Africa. All rights reserved. Unauthorized reproduction, scraping or republication is strictly prohibited and constitutes wilful copyright infringement. If you are reading this on any site other than constructionreviewonline.com, the content has been stolen.
President Bola Tinubu has performed the groundbreaking for the multi-billion-dollar Bakassi Deep Seaport, describing the project as a fiscal game-changer set to catapult Cross River State and Nigeria into a leading hub for the blue economy.
The presidential flag-off of the $3.5 billion project on Friday in Bakassi, Cross River State, has broken a decades-long jinx and revived hopes for a deep seaport in Cross River State, marking a major milestone in efforts to transform the country’s economy. This port development is set to be one of the largest in West Africa with Senegal also planning a mega port.
Speaking during the groundbreaking ceremony of the project, the Nigerian leader, who was represented by Vice President Kashim Shettima, stated categorically that he was not in Calabar “to cut a ribbon and dance Ekpe masquerade” but to “break ground and break centuries-old jinx.
Also Read
San Antonio Port Expansion: Chile Upholds $4B Environmental Approval
“Many people believed this port would never happen. They said it would be a pipe dream. They said Bakassi would only be remembered for what we lost. Today, we answer them with a shovel, with concrete, with steel, and with hope, a renewed hope that a dream deferred can become a dream actualised,” he added.
Also Read
First Container Terminal Officially Launched at $5.5bn Nador West Med Port in Morocco
President Tinubu firmly dismissed long-standing rumours of a port monopoly, suggesting that federal authorities or regional interests in Abuja and the South-West have deliberately suppressed the development of seaports in other parts of Nigeria.
Also Read
Dangote Refinery AI Expansion: Honeywell Deploys AI Platform for $14.3B Upgrade
Bakassi Deep Seaport Groundbreaking
Significance of the Project
President Tinubu explained why the flag-off of the project broke a decades-long jinx, saying it is a strategic revival of a long-dormant maritime and trade infrastructure project first envisioned during the colonial era and re-engineered in 2014, with its Environmental and Social Impact Assessment (ESIA) completed by March 2015.
Factsheet
Project Name: Bakassi Deep Seaport Integrated Project
Location: Bakassi, Cross River State, Nigeria
Estimated Cost: $3.5 Billion
Primary Financier: African Export-Import Bank (Afreximbank)
Delivery Model: Public-Private Partnership (PPP) regulated by the Infrastructure Concession Regulatory Commission (ICRC)
Technical Specs: Greenfield port featuring a 16-meter water draft capable of accommodating massive deep-sea vessels
Core Components:
Deep-sea maritime terminal for containers, bulk cargo, vehicles, and petroleum products A 275-kilometer, six-lane tolled evacuation superhighway (Calabar–Ogoja–Gakem) An adjacent Free Trade Zone and the 7,000-hectare Bakassi Industrial Park
Key Objective: Establish a major eastern maritime gateway for Nigeria, ease congestion at Lagos ports, and boost agro-export and regional trade across West and Central Africa.
Related
-
ACCIONA Energía Powers up Chile with 1 GWh Battery Storage at Malgarida Solar Plant
16 November 2026
-
Turkmenistan Railways announces international tender for freight wagon spare parts
16 November 2026
-
Hong Kong’s Northern Link rail project enters next phase, with opening expected by 2034
16 November 2026
-
Transport Minister Prof. Makame Mbarawa Warns Contractor over Delays on Tabora–Isaka SGR Project
16 November 2026
-
Ethiopian Railway Corporation and Ethio Engineering Group Sign Cooperation Agreement
16 November 2026
-
Vedanta Reviews Railway Options as Gamsberg Zinc Output Grows
16 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2