TotalEnergies Announces Start of Production in the Absheron Gas Field in Azerbaijan
10 July 2023
Paris, July 10, 2023 – TotalEnergies and its partner SOCAR (State Oil Company of the Republic of Azerbaijan) announce the start of production of the first phase of development of the Absheron gas and condensate field in the Caspian Sea, around 100 km south-east of Baku.
This first phase connects a subsea production well to a new gas processing platform, itself linked to SOCAR’s existing facilities in Oil Rocks. It has production capacity of 4 million cubic meters of gas per day and 12,000 barrels a day of condensate. The gas will be sold on the domestic market in Azerbaijan.
The development of the Absheron field provides an additional gas supply to meet growing demand, at a competitive technical cost and low greenhouse gas emissions intensity, in line with TotalEnergies’ strategy.
TotalEnergies and SOCAR both hold a 50% interest in the project, which is operated by the joint company JOCAP (Joint Operating Company of Absheron Petroleum).
"We are very pleased to announce the start-up of the Absheron gas field, the result of our exploration team’s success. This project is in line with the Company's strategy of meeting the growing demand for gas and reinforces our partnership with the national company SOCAR” said Nicolas Terraz, President, Exploration & Production at TotalEnergies.
***
Related
-
OMV strengthens its organic Upstream growth with Libyan discovery
18 November 2026
-
Agreement on concept for Ringvei Vest – combining several discoveries in one project
18 November 2026
-
Expanding Troll: more gas to Europe
18 November 2026
-
Oil and gas discovery in the North Sea adding volumes to Oseberg
18 November 2026
-
Updated cost estimate for the Snøhvit Future project
18 November 2026
-
Further development of Johan Sverdrup
18 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2